The structures of the house are made up of a series of elements, which in this case we will describe, as an example of its calculation: reinforced concrete, columns, solid slab, joists, vaults and others.
These parts of the reinforced concrete structure are made up of materials such as concrete from which its resistance will be obtained, given by the engineer. For example, a resistance of 200 kg per square cm, this determines the type and quality of cement, sand and stone that the concrete mix contains; likewise, for each element of the structure there will be information on the type of steel rod, its diameter and quantities.
These reinforced concrete structures and their design are found in the structural plans of each one of the projects and their calculations and specifications in the calculation sheets attached to the project.
Vault slabs specify the vault blocks and the amount and type of welded mesh needed to cover the slab.
Calculation of materials for the iron structure
The same thing that we explained to you in advance occurs in iron or wood structures. All constructions with these materials as raw materials will have their calculations and specifications.
In short, it all depends on the material chosen for the construction of the house in question.
Calculation of materials for wooden structure
To calculate the materials in wooden structures, it is important to specify the type of wood and its characteristics, as well as the dimensions of each part.
For floors and ceilings, lumber is counted according to the areas to be covered and then cubed according to lumber thickness specifications.
In roofing, wood is commonly used in the covering of structures, also made of wood, which are covered with tiles after waterproofing.
In floors, a wooden structure must be made that is installed, on a concrete floor base, to which this structure is fixed and on it the wooden planks of the floor are fixed. Everything has to be accounted for separately, with your specifications to give the final amounts of the apartment.
Calculation of materials for the walls
In the walls, it must be defined if the wall is going to be built with concrete blocks, exposed pottery bricks or worked stone. Depending on the type of construction material, this has the specification of the dimensions of the material and the type of mixture to join them in the construction of the wall.
In these cases, to calculate the construction material, the design or the way to lock these elements must be specified in order to define the quantities per square meter that is needed for each one. Also, if the material is going to be visible or not, this detail modifies the quality of the material, since it will not be able to have imperfections, which would later be hidden with the jarres that cover them.
It is very important to calculate well the construction materials.
Calculating how many clay bricks are needed to build a wall
Depending on the dimensions of the elements for a wall, whether it is pottery or cement brick, this determines the quantity per square meter of the material, taking into account the width of the wall, if the rows are double or single
Pottery bricks have different designs:
the hollow brick
It does not support loads but the weight of the same material, the holes in its design make it lighter.
solid brick
It resists loads, with a great finish that can be used on walls with the apparent material, the dimensions of each one are exact.
the perforated brick
It has about 10% perforations in its shape, this allows the cement to penetrate when a wall or wall is being built and gives it greater resistance.
You must calculate the mortar or mixture with which the bricks are going to be glued, and calculate the amounts of cement, sand and lime that you will have, depending on the design you choose.
Prices for this type of finish range from $80 MX per square meter to $400 MX per square meter. It depends on the type and the quantities that are contracted. Do you need help with your project? Contact us! LET US BEGIN
Calculation of floor finishes
From the polished concrete on the floors to the marble. It is counted according to the square meters needed to cover the floor areas.
The type and amounts of mix are also included in the calculation, in cases where it is needed to glue the pieces together. In the case of the cement floor, the thickness and strength should be decided, in order to cube the amount of cement. In this way, you can quantify the materials that the floor has.
It is important not to forget about the dosage of concrete.
On roofs, the type of waterproofing that will be used. Its duration is first determined. Either 5 years or 10 years, and its cost will depend on this.
Calculation of roof waterproofing:
Waterproofing is done on a concrete or wooden roof. Always before placing any other coating and after having defined the slopes of the roof.
In the case of a flat concrete slab, this is calculated per square meter of roof.
In tiled roofs, these already have an established slope, depending on the type of tile.
The quantities of tiles are also calculated per square meter. It depends on the dimensions and type of the material. Its design and installation specifications. Since they must have an overlap in their assembly.
Roof dimensions include eaves, ridge, and any design elements that need to be covered by shingles.
How to calculate the cost of electrical installations
They have as components: the pipes that channel through the walls and ceiling. The electrical conductors that are cables of different dimensions or calibre. And also, the number of outlets, and the rooms where it is located. In addition, equipment that it feeds.
The calculations of the electrical installations are carried out by the electrical engineer for its design.
As essential accessories of electrical installation materials, there are switches, sockets and lamp holders, as well as a system of safety devices and electricity control. These are counted: some by linear meters, the canalization and the conductors; the rest per unit, specifying type, caliber, quality, brand and model as the case may be.
Sanitary facility, include the introduction or supply of white water that reaches the house. And the black or residual water, that is discharged into the city’s sewage system.
All this type of installation is handled with iron, copper and concrete pipes depending on the use, with the appropriate diameters, calculated by the professional responsible for this design.
Grease traps, sump grates, visitation boxes, their designs and dimensions are also calculated.
The heaters and sanitary pieces, plus their accessories, are computed according to the specifications of the models and brands chosen.
It is worth mentioning that, at the beginning of the construction. The cleaning of the land, the excavation for the foundations of the structure. And the disposal of the excavation material calculated per cubic meter also enters.
In some cases, a filling material is needed to consolidate the ground. In this case, it is specified what type of material is appropriate. And the quantity according to the design of the base to be built.
Time to start building!
Visit Last Builders Architects
Visit Last Builders today. We have architects who will work at the best of your needs.
With this information and the total dimensions of each of the parts that make up the building, you can calculate the materials that must be purchased for construction. The purchase of these materials can be staggered. Following the construction program that the responsible professional can supply to the owner. And also, depending on the type of contract, that the latter makes with the person or company that will do the construction.
How To Get Home Construction Builders Quotation? Last builders Johannesburg has the answer for you. We are here to help you
Price guide for the construction of a house
January 10, 2023The construction of a new house always brings many doubts and one of the main ones is related to the price. If you have considered building your own home, one of the first things you are probably going to ask yourself is:
How much does it cost to build a house?It is not an easy question to answer, but from Cronoshare we are going to give you some examples to know what the price of a new construction or extension of an existing house is.Calculate your budget to build your ideal home
Indicate the square meters of the house and press the button ‘Calculate my budget’
CALCULATE MY BUDGET
Your budget is:
– €
VAT included. Approximate budget.
Calculate your loan If you are looking for financing to build your new home, compare your loan adapted to your needs in more than 20 banking entities.
Calculate your loan
Index
What does it cost to build a house?
Budget of material execution
What is the cost per square meter to build a house?
Expenses and benefits of the builder
How much does it cost to build the structure of a house?
Technical fees
Terrain studies
Basic and execution project
Construction management
Municipal licence
Planning licence fee
Tax on buildings, installations and works
Deed for new work
First occupation licence fee
Certificate of occupancy
Registration of supplies
Financial expenses
End-of-work cleaning, house furnishing and decoration
Example of price to build a house or single-family home
In this guide, you will find an example of a budget for a construction and execution project. The budget for the construction of a house can be very variable, but here you can get an idea for when the time comes to talk to an architect.As a general rule, when talking about the
price to build a house , experts refer to prices per square meter built, with taxes and licenses already added to the final budget.
The final budget is divided into the following expense items, necessary for carrying out the work. We are also going to show you the
The Material Execution Budget (PEM) includes all the costs of executing each of the expense items that appear in the project measurements.This budget is
highly variable and depends on factors such as the surface of the house, the surface of public and private urbanization, the quality of materials and finishes, the complexity of the construction, the characteristics of the land and the construction company itself.
What is the cost per square meter to build a house?
The approximate value of the Material Execution Budget for a single-family home usually ranges between
€750/m2 and €900/m2 of housing built. However, it is possible to find prices from €600/m2 and up to €1,200/m2. For example, when you want higher qualities or build on terrain that is complicated from a topographical point of view, the price is usually increased. Take advantage and ask for a budget without obligation to build your house.
It is usual to hire a construction company, since this type of company is in charge of the construction of the house.They start from the study of the plans and measurements of the project and, from there, they prepare the contract budget, which is usually 19% higher than the Material Execution Budget. The reason: includes overhead (13%) and builder’s profit (6%).In any case, a builder can take care of: foundations and structure, rooms and wall and floor coverings, lacquered doors, custom frames and cabinets, roof, chimney (optional), facade and insulation, general plumbing installation, general electrical installation, aluminum windows with RPT, power outlets in rooms, antennas and telephone, etc.
Taxes on the self-promotion of homes: The VAT applied to new self-promotion works is 10%.
How much does it cost to build the structure of a house?
One of the aspects that determines the quality of any construction is its structure. In this sense, it is not convenient to spare efforts, much less resources, when we talk about the construction of the structure of a house.Today the types of materials most used for this type of issue are:
Concrete: It is a very resistant and effective material. It also resists fire quite well, a great advantage for the structure of a house, since it can be a way to reduce the risk of fire.
Wood: Wooden structures also have many advantages. This material favors thermal insulation. On the other hand, they are often left uncoated, since they are aesthetically attractive.
Steel: Structures built with this material are usually cheaper and are installed relatively quickly.
Depending on the material chosen, we have prepared a table with different prices per square meter. It should be borne in mind that these are indicative figures and that they may vary depending on each case.
PRICES OF STRUCTURES PER M2
structure type
Price
Concrete
€125/m2 – €140/m2
Wood
€185/m2 – €200/m2
Steel
€90/m2 – €100/m2
PRICE OF STRUCTURES
There is also the possibility of choosing a mixed structure that combines various materials (usually steel and concrete).In any case, it must be taken into account that the structure of a house includes both the foundation, the framework of beams, the pillars, the slabs, etc. As is logical, if we take all these aspects into account, the final budget will be higher.The construction of the
structure of a house , also counting the price of the foundation, can cost
Technical expenses are usually classified into three types:
terrain studies
Topographic study: Draw the exact geometry of the plot where the house is built. The price of a topographic study is between €250 and €400 depending on the situation and surface of the land.
Geotechnical study: It gives us the characteristics of the terrain and serves to design an adequate foundation. Its price usually ranges between €650 and €800.
Basic and execution project
The architect’s fees for the drafting of the basic and execution project vary depending on two factors: the complexity and the surface of the house. Normally the fees are around 4% or 6% of the Material Execution Budget. Therefore, we can say that the fees of an architect for a single-family home amount to a figure between 4% and 6% of the PEM, although sometimes percentages higher than 15% can be established. However, this is only an estimate, and it should be specified that there are currently no scales that establish or can offer indicative prices for this type of service. Law
25/2009, of December 22, in its article 5, pronounces on the prohibition of recommendations on fees, among other aspects. This means that, it is very difficult to establish the cost of an architect’s fees, and that it can vary greatly from one case to another.
Construction management
It consists of three trained professionals:
Project manager (architect)
Execution director (rigger or technical architect)
Health and safety coordinator (competent technician)
The architect and surveyor fees for construction management depend on the complexity and surface area of the home, and are usually around
2% or 3% of the Material Execution Budget each. The VAT applied to technical fees is 21%.
Do you want to request a budget to build a house? Free and without obligation ASK FOR BUDGET
In general we find two types of fees that vary depending on each municipality.
Planning license fee
The purpose of this rate is to control the adequacy of the project to what is established in the municipal regulations. It can be around
1% or 2% of the Material Execution Budget.
Tax on buildings, installations and works
It is necessary to obtain permission to start the work. Around
4% of the PEM .In addition, to obtain the building permit it is usually necessary to deposit a deposit in relation to the management of construction and demolition waste.
Deed for new work
At the end of the work, the deeds must be notarized and must be registered in the Land Registry.The fees of the notary and registrar are stipulated through tariffs set by law. The sum of both is around 0.5% of the value of the property.
First occupation license fee
The town halls verify that the works have been carried out in accordance with the project that was presented in the license application. If the final cost has varied, there may be an upward or downward readjustment of this tax.
Certificate of occupancy
It is used for the Autonomous Community to verify compliance with the habitability conditions of the home.
Registration of supplies
The most common is to have about 200 euros for each supply: water, electricity, gas and telecommunications.
If bank financing is needed, you have to add the appraisal expenses (between €300 and €400), the notary and registration expenses (around 0.5% of the mortgage liability), the Tax on Documented Legal Acts (around 1% or 1.5% of the mortgage liability), the opening commission (around 0% or 1% of the loan amount) and bank interest that depends on the mortgage underwriting conditions.
End-of-work cleaning, house furnishing and decoration
Now that we have our new house we will have to clean it after the work. The same occurs with furniture and decoration, which can represent an average of 10% of the initial budget for the execution of the work.
Example of price to build a house or single-family home
Type of housing: Single-family with 2 floors.
Surface: 120 m2.
PRICE TO BUILD A HOUSE OF 120 M2 In Euro €
Concept
Price
Material execution budget (€800/m2)
€96,000
Contract budget (952 €/m2)
€114,240
Subtotal
€210,240
Subtotal with VAT (10%)
€231,264
terrain studies
€1,100
Basic and execution project, architect fees
€4,800
Construction management
€1,920
Technical architect fees
€1,920
Subtotal
€9,740
Subtotal with VAT (21%)
€11,785
Planning license fee
€1,440
Tax on buildings, installations and works
€3,840
Registration of supplies
€500
TOTAL
€225,760
TOTAL WITH VAT
€248,598
Now you can
Request estimates from construction companies to find out what it would cost you to build the house you have dreamed of. Don’t wait for more! Keep in mind that to all these costs you still have to add the price of the plot, the Property Transfer Tax, the financial expenses of the mortgage, notaries, commercial registry and the furniture of the new house. In summary, we should add at least another 20% or 30% of the cost that we have seen in the table above. Continuing with the previous example, and to answer the question “How much does it cost to build a house?”, we can conclude that, as a guideline figure, in the case of a 120 m2 single-family home, the price for its construction would be around €178,700.
If the house has land, you may also want to build a pool. In this article, we discuss in depth how to build a pool and how much it costs. And, in relation to those owners who want to
raise or build a new plant in their house , it should be noted that this article can also serve as a reference. In fact, many of the steps required for new construction coincide with the steps for building on an existing plant.
multitude of designs and types of architecture .The latest fashions in house construction show a series of clear trends that we detail below, along with an
average price according to the type of architecture of the house.
Manufactured Home Construction
Prefabricated houses are an interesting option when you want to build a house and the process does not take long. The main advantage of this type of construction is that, sometimes, its price is reduced by up to 30% compared to new construction houses (not prefabricated). Prefabricated houses are made of materials as diverse as concrete, steel or wood.
Gauteng and the Western Cape this in second and third, with average costs of R13,330 and R13,150 per m2 – costing R1. … How much it costs to build a house in South Africa – Johannesburg vs Cape Town vs Durban.
Province
Gauteng
Average cost per m2
R13 330
Standard 146 sqm house
R1 945 000
90 sqm house
R1 200 000
House pricing
This price can be achieved because they are houses that are assembled in factories. In this way, it is possible to save the entire structure, but the foundation is still necessary. And for its construction the same permits and legal requirements are needed. If you are looking for a budget for the construction of a prefabricated house, at Last Builders, we put you in contact with up to 4 construction companies in your area. Wooden houses tend to have lower prices than prefabricated concrete houses. In any case, the companies in charge of its construction usually offer turnkey projects.
When it is decided to build the house outside the city or the urban core, there are usually fewer restrictions on the design. In these cases, you can opt for more modern styles on the facade and exteriors. The main characteristics of this type of housing are the use of spaces, the latest fashion furniture, large windows, innovative access systems, micro-cement, concrete, and neutral colours. On the other hand, it is possible to find competitive prices for houses with modern architecture, depending on the province or place of construction. As a guide, prices start
from €112,000 (VAT included) for about 85 square meters for a house with modern architecture.
In this type of housing, defined, more classic and “lifelong” styles prevail. They are houses that withstand the passage of time indefinitely, since their design is timeless. On the other hand, when using higher quality materials, prices usually exceed the national average price.
The chalets would be an example of this type of construction. The prices to build a chalet follow the same rules as for other types of houses, since licences are needed, an architect, etc. The average price of these rustic constructions is approximately
€150,000 for houses of 100 square meters.
Construction of ecological houses
Ecological houses use materials such as wood, marble or glass to minimize the impact on the environment. And, apart from being ecological, this type of house is energy efficient and has excellent energy consumption rates. You can read more information about this type of house in our article on ecological houses. The average price of these ecological constructions is approximately
Today, building a house can cost you between €700/m2 and €1,200/m2 taking into account building permits, fees for the necessary professionals, quality of materials, etc.
PRICES OF CONSTRUCTION OF HOUSES ACCORDING TO M2
square meter
Price
House of 50 m2
Between €35,000 and €60,000
House of 70 m2
Between €49,000 and €84,000
House of 100 m2
Between €70,000 and €120,000
House of 150 m2
Between €105,000 and €180,000
Therefore, the conclusion we can draw is that a 50 m2 house can cost you between €35,000 and €60,000, while the price of a 70 m2 house costs between €49,000 and €84,000. If you want to build a bigger house, of about 100 m2, its price ranges between €70,000 and €120,000. And a 150 m2 house can cost you between €105,000 and €180,000.If you already know how big you want to make your home, the next step is
Building a house is an expensive and complex process. That is why there are a series of steps that should not be taken lightly when you want to ensure
the best price and the best quality in the building process.You cannot assume more risks than those already anticipated. Everything has to go smoothly so that the budget does not deviate or skyrocket from the original due to errors in design, construction, etc.Nor should we leave aside the problems that may prevent the completion of the work due to bureaucratic, legal or other characteristics.
construction feasibility
Before buying the land, you must make sure that it is viable in terms of urban regulations for the construction of houses. For this, it is possible to request the advice of an architect, and it must be recorded in writing based on municipal ordinances. It is necessary to take into account the peculiarities that may be required by the adjacent communities of owners and whether the land is suitable for building. The best option is to carry out a geotechnical study of the terrain.
Another very important point is to check the availability of the supply of basic services : natural gas, electricity and water supply. Also important, but to a lesser extent, would be Internet access (ADSL or fibre) and access to housing through paved roads. In addition, you have to choose the architectural style of the house and this will influence the final price of the budget. And the choice of land is also key in relation to this, since if the land is not flat, it will have to be levelled and the price of the house will become more expensive.
This is one of the initial points when starting the construction of a house, whether it is a new construction, extension or reform. Among the basic points that a
construction project can reflect, we could highlight the following:
Location, number of floors, elevation.
Structure type.
House plans.
Materials used in construction.
Maximum budget.
Certain details must also be taken into account, such as how many people are going to inhabit the house, or the licenses and permits that need to be obtained.With the construction project, the
execution project is prepared, which must be completed before starting the works. It must contain all the details of the housing facilities, structures, foundations, etc.
Budget
Every would-be homeowner has wondered how much it costs to build a house; the house they have devised.The
budget to build a house must incorporate all the elements related to the construction, including the professional fees of the interveners, the rental of machinery, the materials, the labor, the rubble
Containers or any other aspect. You must also include the cost of licences or permits, as well as any associated taxes. Advice: Fixed prices must appear in the final budget to avoid surprises, such as an unjustified price increase in the middle of the work.
Construction Tracking
With the beginning and execution of the works you can take into account
some tips so that everything goes in order and without surprises:
Maintain fluid communication with the architect (partial construction calls are important).
Know at all times the progress in the form of meters built, materials used and their cost.
Ask for delivery notes to verify prices.
Make regular site visits to see that everything is being built according to plan.
Permissions and licenses
This point is better left in the hands of the architects and surveyors, since they know the local regulations and associated taxes in all phases of construction of the house.
How much do licences and permits cost to build a house?
It is usually around 5% of the cost of the Housing Material Execution Budget.
The most important professional that we must have for the construction of a home is the architect. His work is fundamental, and we must spare no effort in the search for him. We continue with another professional who would be the second in order of importance. In this case, we are talking about the builder, who is in charge of building the work from the plans.
If you have a trusted architect, they may be able to offer good advice on hiring a reputable construction company. From here, we can choose the rest of the professionals involved in the work: plumbers, carpenters, gardeners, painters, etc. We can also leave this selection in the hands of the builder, which will sometimes be an essential requirement for hiring him. And if you are considering
buying an old home to reform , you can also request an estimate and find information on
How much a comprehensive reform costs, so that you can assess other alternatives. Specifically, if you want to renovate a house, you can consult our article on how much it costs to renovate a house. Although, if the house is very old, it may be worth requesting prices to tear down the house and build a new one.
Terms to know about the construction of houses
Technical Building Code : The Technical Building Code (CTE) is the main set of regulations that regulate the construction of buildings in national territory.
Energy certification : Document that verifies the standard of general consumption of the house.
Land price : Average price per square meter depending on municipalities or areas.
Certificate of habitability : Permit that certifies that the house is habitable in accordance with current urban regulations.
Quantity surveyor or technical architect : He deals with the drawing up of partial plans, provision of materials and economic terms in the construction of buildings. He is a certified technician.
How much do we save by being self-promoters compared to a real estate developer?
We can save and avoid real estate developer costs if we buy the plot ourselves.The 20% benefit that a real estate developer would apply to the final price of the house can be eliminated if we do this task ourselves.On average, being a self-developer saves 20% compared to the “usual” purchase through a real estate developer, so building your own home can be a good option. But it is necessary to have certain knowledge, money saved and time to do the negotiations with the different construction companies that would intervene in the work.